WHY
WEST REGION
5 reasons to invest
Business environment
Sevices of West RDA
Investor Locations
Success Stories
Photo Gallery
Strategic Partners
Resources
Discover West Region
WEST REGION
EVENTS
OPERATIONAL COSTS IN ROMANIA, 2011
Operational costs on January 1st, 2010 |
Costs on October 1st, 2011 |
Source |
Office fees, EURO/m2/month |
||
Office rent, Timisoara |
7-15 EURO/sqm/month |
|
Construction costs, EURO/m2 | ||
Industrial constructions |
500-700 EURO/sqm |
|
Office constructions |
650-850 EURO/sqm |
|
Water rates (drinking water, sewerage) VAT-inclusive, RON/m3 | Aquatim |
|
Industrial water rate (drinking water, sewerage), VAT-inclusive, RON/m3 | drinking water - 2.63 lei/m3; sewerage - 2.29 lei/m3 |
|
Household water rate (drinking water, sewerage), VAT-inclusive, RON/m3 | drinking water - 2.63 lei/m3; sewerage - 2.29 lei/m3 |
|
Telecom rates, VAT-exclusive, Euro |
Romtelecom |
|
Business landline installation fee, without VAT, Euro |
0 Euro |
|
Telecom usage fee for businesses Voce Net Mobile Unlimited, without VAT, Euro | 26.9 Euro |
|
International calling rates/minute, without VAT, Euro |
0.03 Euro/minute |
|
Electricity supply rates, kWh, VAT-exclusive, RON/kWh (Prices differ on power and consumption) |
National Energy Regulation Authority |
|
Electricity, industrial use |
||
High voltage electricity fees (220 kV) |
21.00 lei | |
High voltage electricity fees (110 kV) |
||
Electricity, household use |
||
Low voltage electricity fees (0.1 - 1 kV) |
129.66 lei | |
Medium electricity fees (1- 110 kV) |
42.00 lei | |
Fuel price, VAT-inclusive, RON/l |
||
Petrol (octane grade 95) |
5.53 lei/l | |
Petrol (octane grade 98) |
5.99 lei/l | |
Euro Diesel 5 |
5.60 lei/l |
|
Natural gas price, VAT-exclusive, RON/MWh |
E.On Gas Romania |
|
Natural gas price, industrial use, VAT-exclusive, RON/MWh -final consumers connected to the national transport system |
-annual consumption up to 1162.78 MWh: 74.18 lei/MWh; -annual consumption 1162.79-11627.78 MWh: 73.96 lei/MWh; -annual consumption 11627.79-116277.79 MWh: 73.78 lei/MWh |
|
Natural gas price, household use, VAT-exclusive, RON/MWh -final consumers connected to the distribution system |
-annual consumption up to 23.25 MWh: 96.20 lei/MWh; -annual consumption 23.26 - 116.28 MWh: 93.24 lei/MWh; -annual consumption 116.29 - 1,162.78 MWh: 92.64 lei/MWh; -annual consumption 1,162.79 - 11,627.78 MWh: 92.11 lei/MWh; -annual consumption 11,627.79 - 116,277.79 MWh: 91.42 lei/MWh; -annual consumption above 116,277.79 MWh: 89.93 lei/MWh |
USEFUL
INFORMATION
Establishing your business
Doing business
Structural Funds
Legislation
Authorizations
INFORMATION
NEWSLETTER
In curand
PRESS
ARTICLES
Invitation - Centro Exporta Business Matchmaking 2018 ARTICLES
17/10/2018 / “Open4Business” Matchmaking Event, 4-6 October 2017, Pécs, Hungary
03/08/2017 / “Match4Industry Business Matching Event”, 6th ed., Matchmaking Event, 2-3 November 2017, Kocaeli, Turkey
31/07/2017 / “EU-China Business & Technology Cooperation Fair”, Conference and Matchmaking Event, October 24th - 31st 2017, Beijing, China
11/07/2017 / “Business Internationalization Forum”, Conference and Matchmaking Event, November 3rd 2017, East Sarajevo, Bosnia and Herzegovina
30/06/2017 /
SUCCESS
STORIES
STORIES
HUF Romania - project assisted by West RDA
An exclusively assisted RDA West project, HUF Romania was established in the first part of 2006 at West Industrial Area Arad location. RDA West prepared the first visit in West Region Romania of the t...
An exclusively assisted RDA West project, HUF Romania was established in the first part of 2006 at West Industrial Area Arad location. RDA West prepared the first visit in West Region Romania of the t...